← HonkWatch.com

Is Hightail down in Saint Pierre and Miquelon?

Hightail has problems

People in Saint Pierre and Miquelon: 0 reports in the last hour Official page: Partial outage reported, checked 13 min ago Our checks: loads from 35 of 35 places

1 open incident: Middle East ME22 is experiencing an outage

Partial outage reported by Hightail 1 of 267 parts affected: Enterprise Service Management / Middle East ME22. Going on for 5 d 8 h. Updated 7 Nov, 19:37 UTC, 13 min ago · Official status page
Report a problem
Change country

Known issues (from OpenText's status page)

Incidents

  • Middle East ME22 is experiencing an outage (investigating, critical impact) Since 21 May 2026, 16:57 UTC. Affects Middle East ME22 · Details Latest update (2 Nov, 14:10 UTC): Middle East ME22 is currently unavailable due to regional conditions in the Middle East. We sincerely apologize for any inconvenience this may cause. Updates for this issue will be posted as soon as there are significant updates. We appreciate your patience.

Maintenance

  • Network Maintenance scheduled for 07 November 2026 (planned) 7 Nov, 21:00 UTC to 8 Nov, 01:00 UTC · Details Latest update (6 Oct 2026, 10:43 UTC): On 07 November 2026 from 21:00 to 08 November 2026 01:00 GMT a network maintenance has been scheduled that will affect these services: • OpenText EasyLink GMS (NA) • OpenText ICC Service will be degraded during this timeframe. If the maintenance is unable to be performed on the date specified above,
  • OCP Canada maintenance (planned) 7 Nov, 22:00 UTC to 8 Nov, 03:00 UTC. Affects Core Capture, Core Capture for SAP® Solutions, Core Collaboration for Engineering, Core Content Management and 3 more · Details Latest update (29 Oct, 20:47 UTC): As part of our ongoing infrastructure modernization efforts, we will be performing scheduled maintenance to migrate database services to Google Cloud SQL. During this maintenance window, customers using Core Content, Core SuccessFactors, Core Compliance, Core for Supplier Exchange, Developer Experie
  • Network Maintenance scheduled for 08 November 2026 (planned) 8 Nov, 02:00 UTC to 8 Nov, 06:00 UTC · Details Latest update (8 Oct, 09:40 UTC): On 08 November 2026 from 02:00 to 06:00 GMT a network maintenance has been scheduled that will affect these services: • Data Center Network Access • Electronic Data Interchange (EDI) • Interconnect Traffic • Messaging Services • OpenText Client Custom Applications • OpenText CSP • OpenText Document
Show 7 more maintenance windows
  • C2334043 - Rescheduled Managed Services maintenance (planned) 8 Nov, 03:00 UTC to 8 Nov, 07:00 UTC · Details Latest update (23 Oct, 20:10 UTC): The Managed Services maintenance originally scheduled for 25 October 2026, from 02:00 to 06:00 UTC has been rescheduled to 8 November 2026, from 03:00 to 07:00 UTC. Services Affected: OpenText Trading Grid (Classic) Impact: Service will be degraded during the first 1 hour of this timeframe. Customer
  • IM4009810 C2337470 - Certificate Renewal (planned) 8 Nov, 03:00 UTC to 8 Nov, 07:00 UTC · Details Latest update (7 Oct, 09:40 UTC): Services affected: OpenText Trading Grid Messaging Service (TGMS) AS2A - Production https://as2ssl.am.gxsics.com OpenText AS2 IDs vary by connection. HTTP connections are not impacted. Impact: After 08 November 2026, clients and their trading partners may be unable to securely connect to production
  • IM4009131 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details Latest update (6 Oct 2026, 11:30 UTC): Services affected: OpenText Trading Grid Messaging Service (TGMS) - Production https://web.tradinggrid.gxs.com SSH/SFTP/HTTP connections are not affected. Impact: After 08 November 2026, clients and their trading partners may be unable to securely connect to production OpenText Trading Grid Messagin
  • IM4004737 and C2343513 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details Latest update (6 Oct 2026, 11:27 UTC): Services affected: OpenText ICC.net Bizlink using AS2 Production https://as2bizlinkp2.easylink.com/ipnet/as2 Impact: After 08 November 2026, clients and their trading partners may be unable to securely connect to OpenText ICC.net Bizlink using AS2 via https://as2bizlinkp2.easylink.com/ipnet/as2 if t
  • Frankfurt EU8 Infrastructure Upgrade Maintenance scheduled for 8 November 2026 (planned) 8 Nov, 04:00 UTC to 8 Nov, 08:00 UTC. Affects Frankfurt EU8 · Details Latest update (20 Oct, 15:04 UTC): Frankfurt EU8 will undergo planned infrastructure upgrade maintenance on 8 November 2026, from 04:00 to 08:00 UTC. These improvements are intended to strengthen overall system resilience, scalability, performance, and operational reliability, while ensuring continued alignment with current platform
  • Oregon US6 Infrastructure Upgrade Maintenance scheduled for 8 November 2026 (planned) 8 Nov, 04:00 UTC to 8 Nov, 08:00 UTC. Affects Oregon US6 · Details Latest update (20 Oct, 19:08 UTC): Oregon US6 will undergo planned infrastructure upgrade maintenance on 8 November 2026, from 04:00 to 08:00 UTC. These improvements are intended to strengthen overall system resilience, scalability, performance, and operational reliability, while ensuring continued alignment with current platform sta
  • IM4004744 C2334766 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details Latest update (7 Oct, 09:11 UTC): Services affected: OpenText Trading Grid Messaging Service - Biz (EMEA) - Production bizlinkp12.ics.eu.gxs.com Impact: After 08 November 2026, clients and their trading partners may be unable to securely connect to production OpenText Trading Grid Messaging Service - Biz (EMEA) services via bizlinkp

We keep the first 10 of 48 maintenance windows; the rest are on OpenText's status page.

In OpenText's own words, as we read them every 15 minutes, last 13 min ago. Read OpenText's status page

Reports from people in Saint Pierre and Miquelon

Last 24 hours · Saint Pierre and Miquelon · times in UTC

0 reports

No community reports in the last 24 hours from Saint Pierre and Miquelon. Having trouble? Add your report.

Status page: partial outage, 2 Nov, 10:53 to now 024 00:0006:0012:0018:00 20:00-20:05 UTC: 25 of 25 places loaded it, typical 879 ms20:05-20:10 UTC: 27 of 27 places loaded it, typical 1193 ms20:10-21:00 UTC: 35 of 35 places loaded it, typical 945 to 1321 ms21:00-21:05 UTC: 31 of 31 places loaded it, typical 1197 ms21:05-21:10 UTC: 25 of 25 places loaded it, typical 1234 ms21:10-21:50 UTC: 35 of 35 places loaded it, typical 860 to 1090 ms21:50-21:55 UTC: 28 of 28 places loaded it, typical 1293 ms21:55-19:50 UTC: 35 of 35 places loaded it, typical 837 to 1168 ms19:50-19:55 UTC: 4 of 4 places loaded it, typical 642 ms Typical response time of the places that loaded it, at most 1321 ms

Bars: reports every 15 minutes. Reports alone do not confirm an outage; a flat chart does not prove everything works.

Tinted columns: when Hightail's status page showed a partial outage, a major outage, as we read it every 15 minutes; the times are when we saw it, not when the provider posted it. Strip under the bars: how many places loaded hightail.com in each 5 minutes, of those that checked, and the line under it their typical response time. Any answer from the website counts as loaded, even an error page. Website checks don't test sign-in, payments or every feature. Tinted columns and our checks are worldwide; the bars count reports from Saint Pierre and Miquelon only.

Latest checks, 19:50-19:55 UTC: 4 of 4 places loaded it, typical 642 ms.

Report totals as of 7 Nov, 19:50 UTC

Report a problem with Hightail

Choose where you are, then tap what isn't working. Tapping a problem sends your report; no account needed.

What isn't working? Tap one to send

Anonymous · one report per service per hour. This adds your experience to the chart; the provider is not contacted.

Compare worldwide reports · Other services in Saint Pierre and Miquelon

Where this status comes from

Provider updates and website checks — Worldwide

The evidence below covers the provider and our available checks. It is not a separate verdict for Saint Pierre and Miquelon. The report chart above is filtered to Saint Pierre and Miquelon.

Our own checks of hightail.com

Every 5 minutes, from our probes

Our checks from 35 cities: all fine.

Amsterdam: loaded in 652 ms Toronto: loaded in 496 ms Querétaro: loaded in 631 ms Port Louis: loaded in 2670 ms London: loaded in 1196 ms Frankfurt: loaded in 1355 ms Los Angeles: loaded in 750 ms Seoul: loaded in 1068 ms Singapore: loaded in 1526 ms São Paulo: loaded in 773 ms Tokyo: loaded in 672 ms St. Louis: loaded in 591 ms Osaka: loaded in 1048 ms Johannesburg: loaded in 1934 ms Delhi: loaded in 999 ms Santiago: loaded in 1588 ms Doha: loaded in 1390 ms Portsmouth: loaded in 1229 ms Madrid: loaded in 674 ms Mumbai: loaded in 1070 ms New York: loaded in 594 ms Atlanta: loaded in 300 ms Bangalore: loaded in 2165 ms Cape Town: loaded in 2128 ms Jakarta: loaded in 1045 ms Seattle: loaded in 149 ms Warsaw: loaded in 767 ms Sydney: loaded in 800 ms Hong Kong: loaded in 1372 ms Dallas: loaded in 528 ms Melbourne: loaded in 1411 ms New Jersey: loaded in 1045 ms Tel Aviv: loaded in 943 ms Hamina: loaded in 778 ms Lauterbourg: loaded in 907 ms
  • AmsterdamReachable652 ms, just now
  • TorontoReachable496 ms, just now
  • QuerétaroReachable631 ms, just now
  • Port LouisReachable2670 ms, just now
  • LondonReachable1196 ms, 3 min ago
  • FrankfurtReachable1355 ms, 3 min ago
  • Los AngelesReachable750 ms, 3 min ago
  • SeoulReachable1068 ms, 4 min ago
  • SingaporeReachable1526 ms, 4 min ago
  • São PauloReachable773 ms, 4 min ago
  • TokyoReachable672 ms, 4 min ago
  • St. LouisReachable591 ms, 4 min ago
  • OsakaReachable1048 ms, 4 min ago
  • JohannesburgReachable1934 ms, 4 min ago
  • DelhiReachable999 ms, 4 min ago
  • SantiagoReachable1588 ms, 4 min ago
  • DohaReachable1390 ms, 4 min ago
  • PortsmouthReachable1229 ms, 4 min ago
  • MadridReachable674 ms, 4 min ago
  • MumbaiReachable1070 ms, 4 min ago
  • New YorkReachable594 ms, 4 min ago
  • AtlantaReachable300 ms, 4 min ago
  • BangaloreReachable2165 ms, 4 min ago
  • Cape TownReachable2128 ms, 4 min ago
  • JakartaReachable1045 ms, 4 min ago
  • SeattleReachable149 ms, 5 min ago
  • WarsawReachable767 ms, 5 min ago
  • SydneyReachable800 ms, 5 min ago
  • Hong KongReachable1372 ms, 5 min ago
  • DallasReachable528 ms, 5 min ago
  • MelbourneReachable1411 ms, 5 min ago
  • New JerseyReachable1045 ms, 5 min ago
  • Tel AvivReachable943 ms, 5 min ago
  • HaminaReachable778 ms, 5 min ago
  • LauterbourgReachable907 ms, 5 min ago

This is separate from the status page: we request hightail.com and note whether it answers. These automated checks do not sign in or use the app's features.

Parts of Hightail

OpenText

Enterprise Service Management

  • Middle East ME22Major outage

266 other parts are working.

Incidents and maintenance

Open incidents

  • Middle East ME22 is experiencing an outage (investigating) Since 21 May 2026, 16:57 UTC. Affects Middle East ME22 · Details

Maintenance

  • Network Maintenance scheduled for 07 November 2026 (planned) 7 Nov, 21:00 UTC to 8 Nov, 01:00 UTC · Details
  • OCP Canada maintenance (planned) 7 Nov, 22:00 UTC to 8 Nov, 03:00 UTC. Affects Core Capture, Core Capture for SAP® Solutions, Core Collaboration for Engineering, Core Content Management and 3 more · Details
  • Network Maintenance scheduled for 08 November 2026 (planned) 8 Nov, 02:00 UTC to 8 Nov, 06:00 UTC · Details
  • C2334043 - Rescheduled Managed Services maintenance (planned) 8 Nov, 03:00 UTC to 8 Nov, 07:00 UTC · Details
  • IM4009810 C2337470 - Certificate Renewal (planned) 8 Nov, 03:00 UTC to 8 Nov, 07:00 UTC · Details
  • IM4009131 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details
  • IM4004737 and C2343513 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details
  • Frankfurt EU8 Infrastructure Upgrade Maintenance scheduled for 8 November 2026 (planned) 8 Nov, 04:00 UTC to 8 Nov, 08:00 UTC. Affects Frankfurt EU8 · Details
  • Oregon US6 Infrastructure Upgrade Maintenance scheduled for 8 November 2026 (planned) 8 Nov, 04:00 UTC to 8 Nov, 08:00 UTC. Affects Oregon US6 · Details
  • IM4004744 C2334766 - Certificate Renewal (planned) 8 Nov, 04:00 UTC to 8 Nov, 06:00 UTC · Details
Outage history

Last 9030 days

0.00% of the time without a reported outage, since 2 Nov

Of the last 90 days, 6 had a partial or major outage, 0 had maintenance only and 84 have no data. Recent problems are listed in a table further down.

90 days ago30 days agoToday

No problems Partial outage Major outage Maintenance No data yet

Recent problems

2 Nov, 10:53 UTCPartial outagegoing on, 5 d 8 h1 of 267 parts affected: Enterprise Service Management / Middle East ME22
What can I try?

Having trouble with Hightail?

  1. Compare reports from Saint Pierre and Miquelon and check the latest update above. A quiet chart does not rule out a new or local problem.
  2. Try the service on another device or switch between WiFi and mobile data, if available. If other sites also fail, check your internet provider.
  3. Report a problem with the feature that is failing and the country where you are affected. Submit once; your report appears in the chart.

Reports describe people's experiences. One report alone does not confirm an outage.

Questions about these results

Questions

Is Hightail down, or is it just me?

Hightail itself reports a problem right now, so it is probably not just you.

How do we know?

We read the official Hightail status page and load hightail.com from our own probes in several cities. People can also report problems here. Their reports appear separately and may reveal issues before a provider update.

How often do we check?

The status page every 15 minutes, day and night, and the website every 5 minutes. We keep 90 days of history: a day we have no reading for shows as "no data yet", never as working.

Other services in Storage and backup

Each card shows that service's own status, not Hightail's. A problem listed here does not mean Hightail has one.

See the live outage feed for Saint Pierre and Miquelon · Find another service